Tuesday, June 17, 2008

Traffic diversion at Silk Board junction

Traffic diversion at Silk Board junction
DH News Service, Bangalore:
In view of the ongoing BBMP work to upgrade the underground drainage system in and around Silk Board Junction and halt flooding during rains, traffic restrictions have been imposed on the roads leading to the Junction.

Vehicles moving from 14th main, HSR Layout junction towards BTM Layout cannot move directly to the Silk Board junction through the HSR Layout 100 ft Ring Road main road. The vehicles should instead turn left and take another road to reach the Junction before taking a left turn and proceeding towards BTM Layout. Vehicles from 14th main HSR Layout junction moving towards Bommanahalli-Hosur Road Junction should move on HSR Layout 100 ft ring road 5th main junction, take left on the Service road, and through Mallige Hotel Junction, reach the Silk Board junction.

The vehicles could then take a left turn and move towards Hosur.
Direction boards have been installed at all the diverted routes.

0 Comments:

Post a Comment

<< Home